These are a few of the installations that have invested in energy saving. For the retrofit projects the return on investment is greater than 34% per year (some over 50%) and in all cases capital cost has been recovered in 18 to 36 months
For the new projects the additional cost of the fittings has been recovered in less than 15 months.
Retrofit Project
|
Load Reduced By |
Applecross High School
|
52.9Kw
|
Dept. Resources Development
|
23.9Kw
|
The Office Of Energy
|
29.5Kw
|
26 Colin Street, Perth
|
18.2Kw
|
Main Roads Dept. WA
|
280.4Kw
|
| John Tonkin Water Centre |
309.4Kw |
| New Installation |
Load Saved |
Chisholme College
|
10.2Kw |
Dongara Hospital
|
56.3Kw |
Harveyshire Council Offices
|
19.7Kw |
Manjimup Research Centre
|
10.3Kw |
Pinpoint Marketing, Sydney
|
9.0Kw |
| Rockingham Env. Centre |
5.2Kw |
|